Montreal Protocol on Substances that Deplete the Ozone Layer
The Montreal Protocol on Substances that Deplete the Ozone Layer (the Montreal Protocol) was agreed on 16 September 1987 and came into effect on 1 January 1989. It came after a series of rigorous meetings and crucial negotiations at the Headquarters of the International Civil Aviation Organisation in Montreal, Quebec, in Canada and was ratified by all 196 United Nations members.
It was developed in order to reduce the production of ozone-depleting substances. Its framework was defined by the Vienna Convention for the Protection of the Ozone Layer, in 1985.
The emissions of ozone-depleting substances increased in the middle to late 20th century, peaking in the late 1980s and contributing to the formation of the 'ozone hole' over the Antarctic. This was linked to the increased use of chemicals such as chlorofluorocarbons (CFCs) in refrigeration, industrial cleaning, foam blowing and air conditioning.
The high-altitude stratospheric ozone layer acts as a shield in the atmosphere, protecting life from harmful ultraviolet (UV) radiation emitted by the sun. Scientific evidence shows that certain compounds can cause considerable damage to and weakening of the earth’s ozone layer, leading to increases in the incidence of skin cancer and cataracts, as well as having an adverse effect on crops, plants and ocean plankton.
Ozone is destroyed by chlorine and bromine atoms within ozone-depleting substances, also referred to as 'halogen source gases', including:
- Chlorofluorocarbons (CFCs).
- Hydrochlorofluorcarbons (HCFCs).
- Halons.
- Methyl chloroform.
- Carbon tetrachloride (the main precursor of CFCs).
- Methyl bromide.
The Montreal Protocol was a landmark international agreement that can lay claim to a series of major achievements, including:
- Being the first treaty to achieve universal participation.
- The production and consumption of the majority of harmful ozone-depleting chemicals has been successfully phased out, in both developed and developing countries. Over 98% of the consumption of all ozone-depleting substances has been eliminated.
- It is anticipated that in the late 21st century, the ozone layer will have substantially recovered. This success has largely been attributed to the development of ‘ozone friendly’ substitutes for ozone-depleting substances.
- The Multilateral Fund, which was set up in 1991 has approved industrial conversion, technical assistance, training and capacity-building, worth over £2 billion.
- The Montreal Protocol is also one of the prime global contributors to the fight against climate change. This is because ozone-depleting substances tend also to be powerful greenhouse gases.
In order to meet the Montreal Protocol obligations, European and UK regulations have been devised.
At the EU level, the regulations are:
- Regulation (EC) 1005/2009 on substances that deplete the ozone layer.
- Amended by Commission Regulation 744/2010 on the critical uses of halons.
At the UK level, the regulations are:
- Environmental Protection (Controls on Ozone-Depleting Substances) Regulations 2011 (SI 2011/1543).
- The Ozone-Depleting Substances (Qualifications) Regulations 2009 (SI 2009/216).
Since its original agreement, the Montreal Protocol has been amended and adjusted several times.
On 15 October 2016 it was announced that 170 countries in Kigali, Rwanda, had agreed that all HFCs should be phased out through an amendment to the Montreal Protocol. See HFC phase out for more information.
[edit] Related articles on Designing Buildings
Featured articles and news
How can digital twins boost profitability within construction?
A brief description of a smart construction dashboard, collecting as-built data, as a s site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure bill oulined
With reactions from IHBC and others on its potential impacts.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Architects Academy at an insulation manufacturing facility
Programme of technical engagement for aspiring designers.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.
The restoration of the novelist’s birthplace in Eastwood.
Life Critical Fire Safety External Wall System LCFS EWS
Breaking down what is meant by this now often used term.
PAC report on the Remediation of Dangerous Cladding
Recommendations on workforce, transparency, support, insurance, funding, fraud and mismanagement.
New towns, expanded settlements and housing delivery
Modular inquiry asks if new towns and expanded settlements are an effective means of delivering housing.
Building Engineering Business Survey Q1 2025
Survey shows growth remains flat as skill shortages and volatile pricing persist.